Taskerr verified providers
New on Taskerr — be one of the first to book

Plastic roof tank placed and connected with inlet, outlet, float valve and overflow line.
The team carries the tank to the roof, sets it level on the base or stand, connects the pump inlet, house outlet with a gate valve, float valve and overflow and drain lines, then fills and checks for leaks.
Takes 2–5 hours depending on size and roof access. The tank, iron stand, pipes and fittings are priced separately; removal of an old concrete tank is a separate job.