Taskerr verified providers
New on Taskerr — be one of the first to book

20A/32A socket with a separate line and breaker from the DB box for AC, geyser or oven.
A dedicated line of the right wire size is pulled from the DB box, a breaker is added and a heavy-duty socket is fitted near the appliance. Wire, casing, breaker and socket cost extra.
The electrician measures the distance from the DB box and gives a material list first. Work is done in 2–4 hours and the load is tested with the appliance on.